Hills District
Bathroom Renovations Pennant Hills
A bathroom that's outlasted three kitchen updates
Pennant Hills homes tend to get renovated room by room over the decades — kitchen in the nineties, deck a few years later — and the bathroom is often the one room nobody's touched since the house was built. Picture a family who's updated everything else and is now stuck bathing kids in a shower recess from the seventies, or an investor who knows the bathroom is the one thing holding a strong Pennant Hills listing back from top dollar.

3–4 weeks on site
Most bathrooms finished in three to four weeks, not months
Certified waterproofing
AS 3740 compliant, so leaks don't come back
Fixed quote
Itemised price before work starts, no surprise extras
Sydney bathrooms, one crew
What a Pennant Hills bathroom renovation looks like with us
We've renovated bathrooms across Sydney long enough to know the difference between a 1970s Western Sydney brick home and a new two-storey build in the Hills. Every Pennant Hills bathroom renovation is priced off a real on-site measure, waterproofed to AS 3740, and finished by the same team that started it.
- Licensed NSW contractor (Lic. 393475C), fully insured
- Waterproofing certified to AS 3740, with photo records at every coat
- Itemised written quote before demolition — every tile, mixer and fitting listed
- One crew, one supervisor, workmanship warranty
More on how we work: bathroom renovations Sydney · our process · all service areas
Housing & construction
What's actually behind the tiles
Homes here are typically brick veneer or full brick from the seventies and eighties, often with original fittings. That means more unknowns than a newer suburb: old cast iron waste, waterproofing that was never properly done, subfloor movement that needs addressing before anything else goes in. We plan for it before quoting, not after starting.

The quote, and what changes for a thirty-year-old bathroom
A Pennant Hills bathroom that hasn't been touched in thirty years needs a quote that reflects the real job, not a best-case guess. We go through what's visible, what we expect to find, and price it accordingly — tiles, tapware, waterproofing, rubbish removal, every cost listed before you sign.
Renovating in Pennant Hills
What we usually find in Pennant Hills bathrooms
The age and build of the house sets the scope long before the tiles do. Here's what we plan for around Pennant Hills.
01
Knocking out the wall between a separate WC and bathroom is the single biggest win in most Pennant Hills layouts.
02
Sloping blocks mean sub-floor access varies wildly; we survey drainage before committing to a fixture layout.
03
Older homes here often need the vent stack relocated to suit a modern shower position.
Pennant Hills specifics
What affects your price in Pennant Hills
Key variables that influence your renovation cost in Pennant Hills, assessed upfront so your quote stays fixed.
How long it's been since the last renovation
a bathroom untouched since the seventies or eighties typically needs more strip-out and subfloor work than one updated more recently.
Cast iron waste and old plumbing
original plumbing sometimes needs partial replacement, which is priced once it's confirmed on site.
Waterproofing condition
original membranes that were never properly installed add rectification time before new waterproofing goes in.
Fixture and tile choice
this moves the number more than almost anything else once the structural work is accounted for.
Local proof
Bathrooms we've completed near Pennant Hills
We're across the Hills most weeks, so the crew that measures your job is the crew that builds it.
120+
Hills District bathrooms completed
3–4 weeks
Typical time on site
Licensed, AS 3740, certificate at handover
Waterproofing

Luxury Main Bathroom
A tired 1990s main bathroom stripped back to studs and rebuilt as a bright, hotel-style room with marble-look porcelain, a lit niche and a stone-top timber vanity.
4 weeks on site

One Bathroom Turned Into Two
A single long bathroom in a Woodcroft family home, reworked into a main bathroom and a separate ensuite so a household of five stopped queueing every morning.
5 weeks on site
Questions
Common questions from Pennant Hills homeowners
Short answers to what people ask before booking a measure.
Older housing stock is the reason the number sits where it does. A seventies or eighties brick veneer or full brick home here often still runs its original fittings, and the rebuild has to go back past them — cast iron waste replaced, waterproofing redone properly, subfloor movement corrected before a tile goes down. That work is what separates a full bathroom renovation from a cosmetic refresh, and it's why the bathroom renovation cost lands in the 22,000–38,000 band rather than below it. Every line is itemised on the bathroom renovation quote before demolition. See cost benchmarks by suburb for how that compares.
Three to four weeks on site, and the sloping block is the variable that decides whether it runs to the short end or the long one. Sub-floor access changes from property to property, so drainage gets surveyed before we commit to a start date — that survey is what stops the build stalling halfway through. Once it's done, the same team carries the job from the first day to the last, and the workmanship warranty covers what they build.
Three things turn up behind these walls more than any others, and we price for them up front: cast iron waste that's reached the end of its life, waterproofing that was never done to standard, and subfloor movement that only shows once the sheeting is off. If the strip-out reveals something outside that list, it's written up and costed before anyone picks up a tool again. New bathroom waterproofing is installed to AS 3740 by a licensed waterproofer, with a photo record at every coat and a compliance certificate when we hand back the room.
On a sloping block, the way in is rarely the way you'd expect. Sub-floor access varies wildly from one property to the next, so the route for materials and waste is walked and confirmed at the measure rather than assumed on the day. Upstairs, everything is carried by hand and the stairwell is protected before demolition starts. The vent stack is the other thing we check early — it often has to be relocated to suit a modern shower position, and that's a job for the planning stage, not the tiling stage.
Yes — the measure costs you nothing, and there's no travel surcharge. We book it inside a week and allow about an hour, because a sloping block takes longer to read than a flat one: we need to see the sub-floor, the drainage and where the vent stack sits before we can price anything honestly. The written quote follows a few days later, itemised line by line. That's how a bathroom remodel Pennant Hills project should start.
We take the job as far as it needs to go, and on this housing stock that usually means further than the tiles. A shower renovation on its own is work we'll do, and so is a complete bathroom renovation that strips the room back and rebuilds it. The scope covers strip-out, rough-in, AS 3740 bathroom waterproofing, bathroom tiling, bathroom fixtures and fit-off — plus the two jobs these homes almost always need: opening the wall between the separate WC and the bathroom to make one usable room, and relocating the vent stack to suit a modern shower. Our bathroom renovation services Pennant Hills work is delivered by bathroom renovation specialists under NSW Contractor Licence 393475C, fully insured, with a workmanship warranty.
Free on-site measure and a written, itemised quote for your Pennant Hills bathroom.
From yes to handover
Three stages, three to four weeks, price locked before we start, one crew from strip-out to handover.
How it works
What happens once you say yes?
Three stages and three to four weeks on site. You'll know the price before we start, how long the bathroom is out of use, and who is turning up each morning.
Measure, design and written quote
We measure the room, check the drainage and what's behind the walls, then give you a scaled layout with every fixture listed and a written price that holds once it's signed.
Strip-out, rough-in and waterproofing
Back to frame, licensed plumbing and electrical rough-in, then waterproofing to AS 3740 photographed at every coat. Same crew, same start time, swept down before we leave each day.
Tiling, fit-off and handover
Tiling, glass measured off the finished walls, tapware and joinery installed. Then we walk the room with you, fix anything you pick up, and hand over the certificates and a workmanship warranty.
Nearby Suburbs
Bathroom Renovations Across Pennant Hills
Our licensed renovation crew services Pennant Hills and surrounding Hills District suburbs with fixed-price quotes and certified waterproofing.
Free quote
Get a free quote in Pennant Hills
Tell us roughly what you're after. We come out to Pennant Hills, measure the room, and send back a written quote with every fixture and fitting listed.
- Free on-site measure anywhere in Pennant Hills
- A local crew who already work across the Hills District
- A written quote with every tile, mixer and fitting listed
- Licensed, insured, fully documented
Other pages Pennant Hills homeowners find useful.
